• HOME
  • ABOUT US
    • Case
    • Company Profile
    • Culture
    • FAQ
    • Honors
  • PRODUCTS
    • Case Show
    • Products
    • Services
  • STRENGTH
    • Design
    • Manufacturing
  • NEWS
  • DOWNLOADS
  • MESSAGES
  • CONTACT US
  •  >   Kaplan Turbine
  •  >   Tubular Turbine
  •  >   Francis Turbine
  •  >   Pelton Turbine
  •  >   Case Show
  •  >   Services
COMPANY NEWS
     POSITION:HOME>NEWS
      The Muong hung power station in Vietnam successfully passed the 72-hour trial run       推荐    [ 2019-05-28 ]
      The 72-hours trial operation of Wucheng shipping Yangbu power station have a completed success.       推荐    [ 2019-02-28 ]
      Yaojia hydraulic power station generate successfully electricity after grid﹣connected       推荐    [ 2019-01-08 ]
      The new environmentally friendly spray booth       推荐    [ 2018-11-29 ]
      Cambodia Battambang HPP          [ 2017-06-30 ]
      The Vrgudinac project was put into commercial operation          [ 2017-06-28 ]
      UN Secretary General Mr. Ban Ki-Moon Meets Jinlun’s President Mr. Wang Hangwei during His Visit in I          [ 2016-07-10 ]
      Mr. Mao Guanglie, Vice Governor of Zhejiang Province, visited Jindong District of Jinhua to make a r          [ 2016-06-18 ]
      Acceptance Inspection on Project in Thailand          [ 2016-05-07 ]
      Occupational Health Knowledge Contest          [ 2016-04-29 ]
      Enterprise with taxes levied reaching 10 million Yuan          [ 2016-04-20 ]
      Jinlun won the bid of hydroelectric equipments contract of Qu River (Jinhua sector) navigation devel          [ 2014-04-21 ]
      Small hydro power technology training teams from African English- speaking countries come to visit          [ 2014-01-14 ]
      Win-win corporation with Latin America          [ 2013-12-13 ]
      Fizuli hydropower station is put into service successfully          [ 2013-01-08 ]
     页次:1/2 每页15 文章数29 9 7 [1] [2] 8 : 
Copyright:Zhejiang Jinlun Electromechanic Co., Ltd.